Step 3, install the cooktop, Step 4, connect cooktop to gas, Warning – GE ZGU48L6R User Manual

Page 8: Avertissement, Installation

Advertising
background image

Alternate Bracket
Screw Holes

“L” Bracket

8

INSTALL COOKTOP

• Lower the cooktop into the opening. Make sure the

cooktop is evenly seated and supported. A side frame
gasket will seal the cooktop to the countertop.

• “L” brackets with screws are provided to secure the

cooktop to the countertop or to adjacent cabinetry.
– Alternate screw hole locations on the sides of the

cooktop allow for varying thicknesses of countertops
or side cleats.

• Select the bracket location; secure the bracket to the

cooktop with 2 screws.

• Drive one screw through the bottom of the “L” bracket

and into countertop or side cleats.

STEP 3

CONNECT COOKTOP TO GAS

A manual shut-off valve must be installed where
it will be accessible.

Assure that gas is turned off at the shut-off valve.

• Install the supplied pressure regulator onto the end

of the gas inlet.

• You can install a 90° elbow (not supplied) onto the

gas inlet and route the gas connections to avoid
interference with drawers or other cabinetry features.

• Make sure the regulator is installed in the right

direction. See arrow on the underside of the regulator.

NOTE: Instead of using solid piping to connect to
pressure regulator, an approved flexible metal appliance
connector may be used between the pipe stub and the
shut-off valve to the pressure regulator, if local codes
permit.

• Appropriate flare nuts and adapters are required at

each end of the flexible connector.

WARNING:

Do not use a flame to

check for gas leaks.

AVERTISSEMENT :

Il ne faut pas utiliser de flamme pour vérifier
s’il y a des fuites.

IMPORTANT: Disconnect the cooktop and the individual
shut-off valve from the gas supply piping system during
any pressure testing of that system at test pressures
greater than 1/2 psig. Isolate the cooktop from the gas
supply piping system by closing the individual manual
shut-off valve to the cooktop during any pressure testing
of the gas supply piping system at test pressures equal
to or less than 1/2 psig.

• Turn on gas and check for leaks:

–Use a liquid leak detector at all joints and connections

in the system.

STEP 4

Regulator
(Supplied)

Solid Piping
or Flexible
Connector

Shut-Off
Valve

Pipe Stub From
House Gas Supply

Cooktop Burner Box

Gas Inlet

Installation

Note: Pipe stub extends
about 1" below burner box.

Advertising
This manual is related to the following products: