Gaggenau AH 600-190 User Manual

Page 18

Advertising
background image

– Screw together the air guidance housing and

screw it onto the two retaining brackets (Fig. 25).

– Establish the pipe connection between the air

connection piece and the air guidance housing.

– Establish the electrical connection.

– Stick the included sealing strips (8 strips) around

the air slots on the top chimney paneling.

– Remove the protective foil from the chimney

paneling.

Note:

Avoid damaging the sensitive stainless steel

surfaces.

– Join the chimney shoe with the chimney base

using the 6 screws (3.5 x 9.5 mm) (Fig. 26).

– Fit the top of the chimney into the base. Make

sure that the fastening holes on the side are at the
top.

– Secure the top duct unit with 2 screws on the

ceiling holder.

– Pull the shoe down into its final position

(Fig. 27)

Note:

Avoid scratches when fitting the elements

into one another by placing the assembly template,
for example, over the edge of the bottom chimney
paneling to protect it.

– Make sure that an activated charcoal filter is

installed (see page 10).

– Reinsert the grease filters.

– Again screw in the two black plates on the left

and right of the chimney.

– Place the glass plates on the black plates.

03.6028.63 12.99 SK

17

Fig. 25

Fig. 26

Fig. 27

Advertising