Installation overview, Required information, Installation overview required information – GE ProBridge PBe User Manual

Page 13

Advertising
background image

9

Installation overview

The basic steps required to install the PBe are:

1. Physically connect the PBe interface to the network

switch or hub and the DVR using the supplied cables.

2. Program monitor mode to on by setting SW1 switches 1

to 4. See

SW1 switches 1 to 4

on page 20 for the switch

settings.

3. Program the camera number to be associated with the

ATM’s transaction data to the PBe. See

SW1 switches 5

to 8

on page 21.

4. Program the DVR to record in the way desired for your

specific site.

Required information

The following information is required for a successful PBe
installation. This information is used to configure the PBe. You
will need to contact the customer’s ATM network administrator
for answers to these questions.

Ethernet device type

•

Generic interface

•

Native ATM messages (FC)

•

Verifone POS

•

Ethernet data analyzer

Advertising