Viii. assembly – Golden Technologies GL140 User Manual

Page 28

Advertising
background image

LiteRider™ Owner’s Manual Rev.A_122810

VIII. ASSEMBLY


Reinstall the Drivetrain
1. Line up the two yellow tabs on the frame, with the two grooves on the drivetrain, one on

each side of the scooter. See figure 20.

WATCH FINGER PLACEMENT! BE CAREFUL NOT TO PINCH YOUR FINGERS!

2. Lower the frame onto the drivetrain until the drivetrain release lever engages. You should
hear an audible click.

           

Figure 20. Drivetrain Alignment Figure 21. Battery Pack Installation

Install the Battery Pack

3. Gently lower the battery pack onto the frame. See figure 21.

Raise the Tiller
4. Loosen the tiller adjustment knob and raise the tiller. See #1 on figure 22.


5. Tighten the tiller adjustment knob at the desired position.

– MAKE SURE YOU TIGHTEN YOUR TILLER KNOB TO BE SURE IT IS

SECURED IN THE DESIRED POSITION!

Figure 22. Tiller Raised and Unlocked

27

1

2

Tiller lock in unlocked position.

Advertising
This manual is related to the following products: