GTO SL-1000B User Manual

Page 38

Advertising
background image

36

S

ETTING

THE

C

ONTROL

B

OARD

FOR

D

UAL

G

ATE

I

NSTALLATIONS

DIP S

WITCHES

The Control Board DIP switches must be set to accommodate your particular type of installation. Since the

SNGL / DUAL, SEQ1, and SEQ2 DIP switches are used by dual gate operator systems, they will be discussed

in the following steps.

S

TEP

4:

Make sure the control box power switch is OFF.

S

TEP

5:

Unscrew and remove the control box cover. Use a small

screwdriver to move the SNGL / DUAL DIP switch to DUAL

(see illustration).

The order of gate operation (“sequencing”) must now be determined

for your dual gate operators to function properly.

Refer to the illustrations on the next page

.

NOTE: The terms “FIRST OPERATOR” and “SECOND

OPERATOR” refer to a unit wired to the terminal block of the

same name.

S

TEP

6:

BOTH OPERATORS OPEN SIMULTANEOUSLY

BOTH OPERATORS CLOSE SIMULTANEOUSLY

SEQ1 = ON SEQ2 = OFF

If SEQ1 is set to ON, and SEQ2 is set to OFF, the FIRST

OPERATOR and SECOND OPERATOR open simultaneously,

and the FIRST OPERATOR and SECOND OPERATOR close

simultaneously (see illustration).

1

2

3

4

ON

OBSTRUCT

SENS.

PULL/PUSH

SEQ1

SNGL/DUAL

SEQ2

MIN

MAX

LEARN

1

2

3

4

ON

OBSTRUCT

SENS.

PULL/PUSH

SEQ1

SNGL/DUAL

SEQ2

MIN

MAX

LEARN

Advertising
This manual is related to the following products: