Installation instructions, Recommended piping for basic installation – GE GN75DNSRSA User Manual

Page 16

Advertising
background image

16

Installation Instructions

RECOMMENDED PIPING FOR BASIC INSTALLATION

This is not an engineered drawing; it is intended
only as a guide and not as a replacement for
professionally engineered project drawings. This
drawing is not intended to describe a complete
system; it is up to the contractor/engineer to
determine the necessary components for and
configuration of the particular system being
installed. The drawing does not imply compliance
with local building code requirements; it is the
engineer‘s/contractor’s responsibility to ensure
the installation is in accordance with all local
building codes. Confer with local building officials
before installation.

3/4″ Ball Valve

3/4″ Union

Pressure Relief Valve

Boiler Drain Valve

KEY

NOTE: If unit is installed in an
environment that can freeze, follow
state and local codes and apply
heat trace to ALL water pipes and
fittings located outside (attic, crawl
space or building structure).

Advertising