Installation checklist – GE Powervent AP13787 User Manual

Page 20

Advertising
background image

20

Installation Checklist

A. Water Heater Location

B. Water Supply

C. Gas Supply

D. Relief Valve

E. Venting

❑

Close to area of vent.

❑

Indoors and protected from freezing
temperatures.

❑

Proper clearance from combustible surfaces
observed and water heater not installed on

carpeted floor.

❑

Sufficient fresh air supply for proper
operation of water heater.

❑

Air supply free of corrosive elements and
flammable vapors.

❑

Provisions made to protect area from water
damage.

❑

Sufficient room to service heater.

❑

Combustible materials, such as clothing,
cleaning materials, rags, etc. clear of the base

of the heater.

❑

Clearances of 1” from combustion air inlet

openings observed

❑

Flammable vapor sensor is not blocked.

❑

Water heater completely filled with water.

❑

Air purged from water heater and piping.

❑

Water connections tight and free of leaks.

❑

Gas line equipped with shut-off valve, union

and sediment trap.

❑

Approved pipe joint compound used.

❑

Soap and water solution used to check all
connections and fittings for possible gas leak.

❑

Gas Company inspected installation (if
required).

❑

Temperature and Pressure Relief Valve
properly installed and discharge line run to
open drain.

❑

Discharge line protected from freezing.

❑

Flue baffle properly hung in top of heater’s
flue.

❑

Blower assembly properly installed.

❑

Vent connector(s) pitched upward to chimney
(¼" per foot of length minimum) .

❑

Vent connector(s) securely fastened together
with screws.

❑

Single wall vent connector(s) at least 6” from
combustible material.

❑

Vapors from PVC cement and primer have
dissipated prior to applying electrical power.

Customer Service

T

roubleshooting Tips

Care and Cleaning

Operating Instructions

Installation Instructions

Safety Instructions

Advertising