7 OPERATION


7.1 PROCEDURES FOR SINGLE LP 33 Series

7.1.1 Start-up

of

the

LP 33 Series

Before connecting hazardous voltages, make sure that:
The connection to the electrical system has been performed by qualified personnel;
The equipment frame has been correctly grounded to the main earth;
Make sure that mains input protection is removed;
All the panels removed to allow the UPS connection have been correctly reinstalled;
The UPS switches Q1 and Q2 are OFF (Pos. 0);
The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery)

are removed.

This procedure must be performed for the first start-up following the installation, with the UPS
completely switched Off and not powered.

This procedure presupposes that the load is not yet supplied by the UPS system.

NOTE !

The UPS can be started-up using the battery supply in case the input mains should be

unavailable.
To avoid an incidental battery
discharge, it is recommended to proceed to the UPS
start-up having the input mains
available.



1. Switch ON the mains power at the input distribution panel.

As a result the UPS performs a self-test and the LCD will show
the following screen:

EXECUTING MAINBOARD

SELF TEST

00000000000
SELF TEST OK!

NOTE !

In case the alarm “4410 - Mains bypass out of
tolerance”
persists, please contact your Service

Center.

2. Insert the battery fuses F5, F6, F7 and eventual external fuses in case of external battery.

Continue