Motorola BT100 User Manual

Page 21

Advertising
background image

2-10

Overview

BT100 Installation and Operation Manual

Accurate

−20 dB directional coupler test points are available at the input and at the outputs of

the amplifier. Because these test points are 75-ohm source impedance, they do not require

special test probes.

After the output amplifier, a second directional coupler provides signal to the optional ADU

board. As this signal is used only with the ADU, you do not need to terminate this port when

the ADU is not installed.
Figure 2-10 illustrates the interconnection between these components in the four output

BT100*-4*.

Figure 2-10
BT100*-4* four output block diagram

Advertising