Completing the test procedures – Motorola BT100 User Manual

Page 43

Advertising
background image

4-4

Bench Testing

BT100 Installation and Operation Manual

Example:

11.2 dB (measured gain)

+ 1.0 dB (equalizer insertion loss)
+ 1.1 dB (power combiner)
+ 0.0 dB (pads)
+ 4.6 dB (cable simulator at 40 MHz)

17.9 dB (unit gain)

Completing the Test Procedures

The amplifier is now approximately tailored for a specific field location. Additional adjustments

after installation are minor in nature. Re-install the fuses removed during testing.

Complete station records by recording pertinent information. Remove test-equipment

connections and close the housing following instructions provided in Section 5, “Installation,”

Closing the Housing.


Advertising