4 getting started, 1 overview of start-up procedure, Getting started – Motorola CPCI-6115 User Manual

Page 37: Overview of start-up procedure, Table 2-4, Startup overview, Figure 2-2

Advertising
background image

Getting Started

Hardware Preparation and Installation

CPCI-6115 CompactPCI Single Board Computer Installation and Use (6806800A68D)

35

2.4

Getting Started

This section provides an overview of the steps necessary to install and power up the CPCI-
6115, any additional equipment requirements, and a brief section on unpacking and ESD
precautions. As identified in the following table, several steps can be omitted if your board has
been shipped with PMCs already installed.

2.4.1

Overview of Start-up Procedure

The following table lists the things you will need to do before you can use this board and tells
where to find the information you need to perform each step. Be sure to read this entire chapter,
including all Caution and Warning notes, before you begin.

Figure 2-2

CPCI-6115 Thermally Significant Components (Secondary Side)

U89

U96

U102

U101

Table 2-4 Startup Overview

Task

Section or Manual Reference

Page

Unpack the hardware

Unpacking and Inspecting the Board

37

Configure the hardware by setting jumpers
on the baseboard and transition module.

Setting Switches and Jumpers

(CPCI-6115)

Jumper Settings

(CPCI-6115-MCPTM)

37
126

Advertising