2 installation, 1 unpacking the box, 2 choosing a mounting location – Maretron MBB100 User Manual

Page 7: 3 mounting the mbb100, Installation, Unpacking the box, Choosing a mounting location, Mounting the mbb100, Ng the box (section 2.1, Mounting the mbb100 (section 2.3

Advertising
background image

®

®

Revision 1.0

Page 3

2 Installation

2.1

Unpacking the Box

When unpacking the box containing the Maretron MBB100, you should find the following items:

• 1 – MBB100 Maretron Black Box Vessel Monitoring and Control

• 2 – Mounting Brackets

• 1 – Short Screw Set (Used for Mounting Bracket)

• 1 – AC Power Cord

• 1 – AC Power Supply

• 1 – Rubber Feet/Long Screw Set

• 1 – MBB100 User’s Manual

• 1 – N2KView

®

Documentation CD-ROM

• 1 – Warranty Registration Card


If any of these items are missing or damaged, please contact Maretron.

2.2

Choosing a Mounting Location

The MBB100 must be mounted in an indoor location.

2.3

Mounting the MBB100

The MBB100 can be mounted to a wall or other flat surface with the included mounting brackets.

2.6.1 Mounting the System with Mounting Brackets
To mount the MBB100 onto a wall or some other surface using the two mounting brackets, please
follow the steps below.

Step 1: Turn the MBB100 over.

Step 2: Align the two retention screws holes in each bracket with the corresponding retention screw

holes on the sides of the MBB100 bottom surface (marked in yellow in Figure 2).


Step 3: Secure the brackets to the MBB100 by inserting two retention screws into each bracket (see

Figure 2).


Step 4: Drill holes in the intended installation surface.

Step 5: Align the mounting holes in the sides of the mounting brackets with the predrilled holes in the

mounting surface.


Step 6: Insert four retention screws, two in each bracket, to secure the MBB100 to the wall.

Advertising