CDVX Series Direct Vent Gas Fireplace

20012253

STEP 6
Support the horizontal pipes every 36” (914 mm) with
metal pipe straps. Make sure that the horizontal vent
pipe is installed on a level horizontal plane.
STEP 7
Re-check the fireplace to make sure that it is levelled,
properly positioned, and nailed or screwed to the floor.
If applied, the fireplaces adjustable frame drywall strips
(nailing flanges) should be fastened. Refer to “Framing
& Finishing”.

CFM137

Rear Vent length

2/26/01 sta

X

High

Temperature Sealant

CFM137

Fig. 32 Apply high temperature sealant.

CFM138

4", 7" collar

2/26/01 sta

X

X

CFM138

Fig. 33 Horizontal length requirement.

Below Grade Installation

When it is not possible to meet the required vent ter-
minal clearances of 12” (305 mm) above grade level
a snorkel vent kit #7TDVSNORK is required. It allows
installation depth of down to 7” (178 mm) below grade
level. The 7” is measured from the center of the hori-
zontal vent pipe as it penetrates through the wall.

If venting system is installed below
ground, we recommend a window well with
adequate and proper drainage.

Ensure sidewall venting clearances are observed.

The maximum horizontal run with 24”
vertical rise is 36” (914 mm) from the
back of the fireplace to the face of the
exterior wall. See vent graph (Page 13) for
extended horizontal run if the vertical rise
exceeds 24” (610 mm).

1. Establish vent hole through the wall. (Fig. 17)
2. Remove soil to a depth of approximately 16”

(406mm) below base of snorkel. Install window
well (not supplied). Refill hole with 12” (305 mm) of
coarse gravel leaving a clearance of approximately
4” (102 mm) below snorkel. (Fig. 34)

3. Install vent system. See Page 14, Steps 2 through 5.
4. Ensure a watertight seal is made around the vent

pipe coming through the wall.

5. Apply high temperature sealant caulking around the

4” and 7” snorkel collars.

6. Slide into the vent pipe and secure to the wall.
7. Level the soil to maintain a 4” (102 mm) clearance

below snorkel. (Fig. 34)

BG400

Below grade installation

2/10/99 djt

10/19/99 added standoffs

24" (610mm)

Minimum*

Firestop

7” Pipe

7TDVSNORK

(Snorkel)

4” (102mm)

Clearance

Min.

Window

Well

Gravel

Drain

Foundation Wall

BG400

Fig. 34 Below grade installation.

*A minimum of 24” (608mm)

vertical pipe must be installed

when using 7TDVSNORK Kit.