Installation – Miele DA210-3 User Manual

Page 27

Advertising
background image

Mounting plate:

DA 210-2

Mounting plate:

DA 220-2

^ Hold the mounting plate up to the

ceiling so that the orange arrow faces
the front of the hood and aligns with
the line drawn on the ceilling.
Mark the position of the four mount-
ing bolts

a for securing the mounting

plate and determining the position of
the hole the power cord

b will pass

through.

Select the hole providing the shortest
route for the power cable

b to reach

the power terminal located at the top
of the hood’s chimney.

^ Feed the ductwork and power cable

through their respective holes in the
ceiling.

If 6" (150 mm) ductwork is not possible
then 5" (125 mm) ductwork can be
used in conjunction with a reducing
collar available from the Miele Technical
Service Department (see "Installation /
Air extraction" for further details).

^ Drill four

3

/

16

" (5 mm) holes in the ceil-

ing.

The S10 wall anchors included in the
packaging are not for use in
USA/CDN. Be certain that the ceiling
is stable enough to support the
hood.

Installation

27

Advertising