Installation – MGE UPS Systems 30A User Manual
Page 13

34020113EN/AA
- Page 13
PEN
N
PE
PEN
S1
S2
N L1 L2 L3
N L1 L2 L3 N L1 L2 L3
PE
N
PE
PE
N
N
S1
S2
N L1 L2 L3
N L1 L2 L3 N L1 L2 L3
PE
PE
PE
S1
S2
N L1 L2 L3
N L1 L2 L3 N L1 L2 L3
2. Installation
See section 1.3 for information on accessing
the connections.
Connections are made using lugs connected
to threaded studs (diameter 8 mm).
The cables are tied to the earth bar.
See section 1.3 for information on accessing
the connections.
Connections are made using lugs connected
to threaded studs (diameter 8 mm).
The cables are tied to the earth bar.
Upsilon STS 30 to 250 A
Input:
3 phases + PE + Neutral
Output:
3 phases + PE + Neutral
275 mm
275 mm
See section 1.3 for information on accessing
the connections.
Connections are made using lugs connected
to threaded studs (diameter 8 mm).
The cables are tied to the earth bar.
275 mm
Upsilon STS 30 to 250 A
Input:
3 phases + PEN
Output:
3 phases + PE
Upsilon STS 30 to 250 A
Input:
3 phases + PE
Output:
3 phases + PE