1. maintenance label – Miller Electric Trailblazer Pro 350 User Manual

Page 29

Advertising
background image

OM-4401 Page 25

6-2.

Wiring Instructions For Optional 240 Volt, Single-Phase Plug (NEMA 14-50P)

Plug1 7/99 – ST-120 813-D

The plug can be wired for a 240 V,
2-wire load or a 120/240V, 3-wire
load. See circuit diagram.

1

Plug Wired for 120/240 V,
3-Wire Load

When wired for 120 V loads, each
duplex receptacle shares a load
with one half of 240 V receptacle.

2

Plug Wired for 240 V, 2-Wire
Load

3

Neutral (Silver) Terminal

4

Load 1 (Brass)Terminal

5

Load 2 (Brass) Terminal

6

Ground (Green) Terminal

Strip cord jacket back enough to
separate conductors.

Strip conductors enough to make
good contact with plug terminals.
Make plug connections and rein-
stall outer shell and cord grip.

Tighten assembly screws onto
shell. Do not overtighten.

1

2

3

4

5

6

3

4

5

6

240V

240V

120V

120V

Tools Needed:

SECTION 7 – MAINTENANCE AND TROUBLESHOOTING

7-1.

Maintenance Label

Advertising