Installation – MGE UPS Systems 5000 RT User Manual

Page 19

Advertising
background image

34008030EN/AA

- Page 19

2. Installation

2.7 Connection of input/output power cables on UPS terminals

◗

This type of connection must be carried out by qualified electrical personnel.

◗

Before carrying out any connection, check that the battery circuit breaker (19) (see page 8) and that the upstream protection

device (Normal AC source) is open ("0").

◗

Use included insulated ferrules with stranded wires.

1 - Remove the terminal block cover (2
screws) with the included screwdriver.
2 - Insert the Normal AC cable through the
cable gland (8).
3 - Connect the 3 wires to the Normal AC
terminal block.

Always connect first the
earthing wire.

4 - Insert the output cable through the cable
gland (7).
5 - Connect the 3 wires to the output terminal
block.
6 - Refit the terminal block cover and tighten
the cable glands.
7 - Secure the terminal block cover by means
of 2 screws.

7

8

1

7

8

2

4

5

3

7

6

Advertising
This manual is related to the following products: