Rack mounting – MRV Communications MR2228-S2C User Manual

Page 19

Advertising
background image

15

Rack Mounting

Before rack mounting the switch, pay particular attention to the following factors:
• Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range. (See page C-1.)
• Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
• Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1. Attach the brackets to the device using the screws provided in the Bracket

Mounting Kit.

Figure 3-2. Attaching the Brackets

2. Mount the device in the rack, using four rack-mounting screws (not provided).

Figure 3-3. Installing the Switch in a Rack

Advertising