Rear view 37, Installation site 37, Transporting the dryer to its installation site 37 – Miele T 8822 C User Manual

Page 37: Installation, Rear view, Installation site

Advertising
background image

Rear view

a Protruding lid for holding when

moving the dryer (see arrows)

b Air inlet vent for cooling the

condenser unit

c Mains connection cable
d Hose for external drainage of

condensed water

e Accessories for connection to a sink

drain outlet

Installation site

,

Make sure the dryer door can be

opened without hindrance after
installation.

Transporting the dryer to its
installation site

When moving the dryer, hold it by the
lid where it protrudes to the rear. To
manoeuvre the dryer out of its packing
case to its installation site you will also
need to hold it by the front feet.

Building under a continous worktop /
in a kitchen run

,

A building-under kit* with a

coverplate to replace the appliance
lid is required. It must be fitted by a
suitably qualified person to ensure
electrical safety.

N.B. If you wish to push your appliance
under a worktop and there is space to
do this without removing the lid the
building-under kit is not necessary.
Otherwise it is essential.

– The building-under kit is supplied

with its own installation instructions.

– N.B. When built-under drying times

may be longer.

– The electrical socket must be

located in an accessible position
near the appliance.

With niche heights of:

– 830-840 mm, longer screw feet* are

required.

– 870-885 / 915-930 mm, one or two

raising kits* are required.

* Miele accessory available to order

Replacing the lid

If the lid has been removed in order to
fit a coverplate, ensure that, if the lid is
ever replaced, it fits securely into the
rear holders. Otherwise, it is not
properly secure for transport.

Installation

37

Advertising