Diagram 6 – Impex PREMIER User Manual

Page 11

Advertising
background image

STEP 6 (See Diagram 6 & Cable Loop Diagram)
A.) Attach the Lat Bar Holder (#16) to the top of Vertical Beam (#3). Secure it with one M10 x

2 ¾” Carriage Bolt (#79),

¾” Washer (#81), and M10 Aircraft Nut (#84).

B.) Attach the 109” Upper Cable (#26) to the top opening on the Vertical Beam. Attach a

Pulley (#64) to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#68), two

7/8”

Pulley Bushings (#44), and one M10 Aircraft Nut (#84). Make sure the ball stopper on the
Cable is underneath the Frame.

C.) Draw the Cable over the Pulley towards the back of the machine to the opening on the

Upper Frame (#4).

D.) Attach a Pulley to the opening. Secure it with one M10 x 1 ¾” Allen Bolt (#69), two

¾”

Washers (#81), and one M10 Aircraft Nut (#84).

E.) Draw the Cable over the Pulley and downward. Install another Pulley as described in step

D above with two Double Floating Pulley Brackets (#20). Let the Bracket hanging for now.

F.) Draw the Cable around the Pulley and upward through the opening on Upper Frame to the

last open bracket on the rear of the Upper Frame. Install another Pulley.

G.) Draw the Cable around the Pulley and downward to the Selector Rod (#42). Securely

thread the Cable head into the Selector Rod.

DIAGRAM 6

10

Advertising