1 installation – IBM Asynchronous Color Terminals WS525 User Manual

Page 10

Advertising
background image

Installation and Set-Up
1.1 Installation

1.1 Installation

Connect the cables to the system box.

6

K

7

4

1

AC

2

3

5

 

Comm 1,

✁

Comm 2,

✂

Comm 3 (Serial printer),

✄

Keyboard,

☎

Kensington lock socket,

✆

Parallel printer,

✝

Monitor

Connect the cables to the monitor.

Check your monitor manual for correct installation.

Push the system box and monitor power switches on.

A green light in the switch indicates that power is on.

Power Up Selftest

The terminal takes a few seconds to warm up and complete its power

up self-tests. Then, the terminal should display ‘‘

Selftest OK.’’ If a

problem occurs, go to the Appendix A.

1–2 Installation and Set-Up

Advertising