IBM Z10 EC User Manual

Page 46

Advertising
background image

and provide the clock signal to the system transparently,

with no system outage. Previously, in the event of a failure

of the active oscillator, a system outage would occur, the

subsequent system Power On Reset (POR) would select

the backup, and the system would resume operation.

Dynamic Oscillator Switchover is exclusive to System z10

EC and System z9.

Transparent Sparing

The z10 EC offers two PUs reserved as spares per server.

In the case of processor failure, these spares are used

for transparent sparing. On z10 EC sparing happens on

a core granularity rather than chip granularity as on z990

and System z9 (for which “chip” equaled “2 cores”).

Concurrent Maintenance

Concurrent Service for I/O features: All the features that

plug into the I/O Cage are able to be added and replaced

concurrent with system operation. This virtually eliminates

any need to schedule outage for service to upgrade the

I/O subsystem on this cage.

Upgrade for Coupling Links: z10 EC has concurrent

maintenance for the ISC-3 daughter card. Also, Coupling

Links can be added concurrently. This eliminates a need

for scheduled downtime in the demanding sysplex envi-

ronment.

Cryptographic feature: The Crypto Express2 feature

plugs in the I/O cage and can be added or replaced con-

currently with system operation.

Redundant Cage Controllers: The Power and Service

Control Network features redundant Cage Controllers for

Logic and Power control. This design enables non-disrup-

tive service to the controllers and virtually eliminates cus-

tomer scheduled outage.

Auto-Switchover for Support Element (SE): The z10

EC has two Support Elements. In the event of failure on

the Primary SE, the switchover to the backup is handled

automatically. There is no need for any intervention by the

Customer or Service Representative.

Concurrent Memory Upgrade

This function allows adding memory concurrently, up to

the maximum amount physically installed. In addition,

the Enhanced Book Availability function also enables a

memory upgrade to an installed z10 EC book in a multi-

book server.

Plan Ahead Memory

Future memory upgrades can now be preplanned to be

non-disruptive. The preplanned memory feature will add

the necessary physical memory required to support target

memory sizes. The granularity of physical memory in the

System z10 design is more closely associated with the

granularity of logical, entitled memory, leaving little room

for growth. If you anticipate an increase in memory require-

ments, a “target” logical memory size can now be speci-

fi ed in the confi guration tool along with a “starting” logical

memory size. The confi guration tool will then calculate the

physical memory required to satisfy this target memory.

Should additional physical memory be required, it will be

fulfi lled with the currently available preplanned memory

features.

The preplanned memory feature is offered in 16 gigabyte

(GB) increments. The quantity assigned by the confi gu-

ration tool is the number of 16 GB blocks necessary to

increase the physical memory from that required for the

“starting” logical memory to the physical memory required

for the “target” logical confi guration. Activation of any pre-

planned memory requires the purchase of a preplanned

46

Advertising