Check inoculant dosing functionality – John Deere GREENSTAR BZ100157 User Manual

Page 29

Advertising
background image

Installation Instructions

OUZXMAG,0001BF6

–19–18NOV03–2/2

6. Press key C to select “SPFH Network” and check

communication between SPFH and Harvest Monitor.

7. Press RUN key.

OUZXMAG,0002084

–19–04AUG05–1/1

Check Inoculant Dosing Functionality

ZX1035268

–UN–26JUL04

1. Turn ignition key to start harvester engine.

2. Press “SETUP” key to enter SETUP mode.

3. Press key A in “SETUP” to select “Harvest Mon”.

4. Press “PAGE” key to go to “SETUP - Harv Mon -

PAGE 2” screen then press key “F” to toggle inoculant
dosing support state from OFF to ON or vice versa.

5. Press RUN key.

6. The inoculant dosing device can be engaged if:

The road safety switch is in field operating mode

The forage harvester is travelling forward

The ground speed is greater than 2 km/h (1.24 mph)

The feedrolls are turning in forward direction

The header is in harvesting position

7. Press once the liquid injection pump switch (A). Carry

out a test to make sure that inoculant device is
properly connected to the wiring harness AZ101120.

If this is not the case check wiring harness connection
or contact your John Deere dealer.

NOTE: For a proper use of the liquid injection pump

switch (A), refer to the forage harvester Operator’s
Manual.

Z103757 (13DEC06)

27

Installation Instructions

011507

PN=29