Ceiling and wall installation – Jabra SP-CEIL-012 User Manual

Page 6

Advertising
background image

SP-CEIL-012

Page - 6 -

Installation Manual

Ceiling and Wall Installation

Unpack the Gyrolock

®

and review any WARNING statements that apply to the installation. Select the desired

location for the Gyrolock

®

. There are three mounting points for a single stud installation and four mounting

points for a solid structure installation.

NOTE:

Pre-drill all holes (pilot hole – 1/8” drill bit).


Single Stud Installation
1. Locate the center of the single stud where the Gyrolock

®

will be installed. The two (2) center mounting

points for this installation must be used. Use a stud finder to locate the stud that will be used to mount
the PBL (ceiling or wall). It is advised that all holes be pre-drilled with a 1/8” drill bit.

2. Secure the upper plate to the single stud with the two (2) #14 wood screws (supplied).
3. Start to secure the plate to the outer mounting points first. The plate may travel ½" front to back from

center.

4. Secure the final wood screw to the center of the upper plate (Figure 1).


SINGLE STUD

Figure 1. Single Stud Installation


Advertising