11 verticals 12 install top rails – Swim'n Play Above Ground Swimming Pool User Manual

Page 10

Advertising
background image

Attach verticals to bottom plates on the outside

of pool using the No. 10 x 1/2" Sheet Metal

Screws. The holes indented in the face of the

verticals must be on top.

If your pool is equipped with feature tape, it is

best to apply it to the verticals at this time.

On pool models with the 1” top rails and 1

3

/

4

” verticals (A):

Slide the ends of two top tracks into a rail/vertical connector in the
same manner as you have done on the bottom track. Align the
connector directly over a vertical and push the tracks and con-
nector down over the wall and edging, leaving the two exposed
ends in the air. Fasten the connector to the vertical using the #10
x 1/2” sheet metal screw. Slide another connector and a track
into the track already installed on the pool and press connector
and track down onto the wall and edging, again on top of a verti-
cal and leaving one end exposed and in the air. Fasten the con-
nector to the vertical using the #10 x 1/2” sheet metal screw.
Continue in this manner all the way around the pool.

On pool models with the

5

/

8

” and

9

/

16

” interlocking rails (B):

Simply slide a

9

/

16

” rail into a

5

/

8

” rail approximately 2” as done on

the bottom track in step# 2. Press assembly down over the wall
and edging, leaving the 2 exposed ends in the air (fig. 1).
Continue assembly all the way around the pool, pressing the rail
down over the wall as you had done on the bottom track, edging
as you go.

11

VERTICALS

12

INSTALL TOP RAILS

1

2

3

CONSTRUCTION

CLOSE-UPS

A

B

9