1preparing the ground, Warning - leveling the ground – Swim'n Play Above Ground Swimming Pool User Manual

Page 4

Advertising
background image

Your pool must be installed on a solid level surface. Drive a stake into the ground at the center of your pool loca-

tion. With the use of the leveling device shown and a shovel start leveling the ground, removing all grass and sharp

objects such as sticks and stones.
Level area to the lowest spot within the clearance radius. DO NOT FILL IN LOW SPOTS. Give special attention to

the outer part of the circle as this is where the bottom track and pool wall will rest and must be absolutely level.

1

PREPARING THE GROUND

CARPENTER’S LEVEL

CLEARANCE

RADIUS

LEVEL AREA

CLEARANCE RADIUS

DO NOT FILL IN

DIG AWAY HERE

CLEARANCE RADIUS= 1/2

POOL DIAMETER+6”

12’ Pool=6’6”
15’ Pool=8’
18’ Pool=9’6”
21’ Pool=11’
24’ Pool=12’6”
27’ Pool=14’

The assembled pool must have a

vertical distance of 3' from the

top of the pool to the adjoining

grade and the adjoining grade

must remain level for a distance

of 4' away from the pool. Refer

to the drawing at right.

WARNING - LEVELING THE GROUND

THIS IS THE MOST IMPORTANT PART OF YOUR PREPARATION OF POOL SITE. YOU MUST

GIVE CAREFUL ATTENTION TO THIS PHASE. REMEMBER --- YOUR POOL MUST BE INSTALLED

ON SOLID LEVEL SURFACE.

PREVIOUS GRADE

3

Advertising