Assembly & installation (cont.), Thru-the-wall installation – SoleusAir SG-WAC-15ESE User Manual

Page 11

Advertising
background image

ASSEMBLY & INSTALLATION (CONT.)

10

Installing the Chassis into the Cabinet

1. Team lift (two people) the air conditioner chassis and

carefully slide it into the cabinet. Let the front of the air

conditioner hang out approximately 6”.

2. DO NOT PUSH ON THE CONTROLS OR FINNED

COILS.

3. Be sure the chassis is firmly seated in the back of the

cabinet.

4. Insert all screws removed during window installation

and reattach the front face plate, front panel, and the

air filter. Use the REMOVE CHASSIS instructions and

figures 1-6 for reference.














THRU-THE-WALL INSTALLATION


NOTE

: Consult local building codes prior to installation

and/or a qualified carpenter.

Select the Wall Location

This air conditioner has a slide-out chassis, so that it can

be installed through an outside wall as specified below:

IMPORTANT

: The side louvers must never be blocked.

NOTE

: All parts needed for Thru-The-Wall Installation are

provided, except a wood frame, shims, and 10 wood

screws (10-1” long minimum). Select a wall surface that:
1. Does not support major structural loads such as the

frame construction at ends of windows, and under

truss-bearing points, etc.

2. Does not have plumbing or wiring inside.
3. Is near existing electrical outlets, or where another out-

let can or will be installed.

4. Does not have objects blocking the air vents which

limits cooling.

5. Allows unblocked airflow from the rear and sides of the

air conditioner.

Prepare the Wall

1. Prepare the wall in frame construction (including brick

and stucco veneer). Working from inside the room, find

the wall stud that is nearest the center of the installa-

tion area.

Model SG-WAC-25ESE

SG-WAC-15ESE

/

SG-WAC-18ESE

Max Wall

Thickness

12” 10”

FIG. 1

Advertising
This manual is related to the following products: