Assembly & installation (cont.) – SoleusAir SG-WAC-15ESE User Manual

Page 9

Advertising
background image

ASSEMBLY & INSTALLATION (CONT.)

8

4. Install top angle side to cabinet as shown in FIG. 7.

5. Slide "I" section of window filler panel into side retainer.

Do both sides.

WINDOW FILLER PANEL

WINDOW FILLER

PANEL

SIDE RETAINER

SIDE RETAINER

FIG. 8a

FIG. 7

Foam Gasket and Top

Angle Rail

Top Angle Rail and Side Bracket Installation

1. Place the air conditioner on a hard flat surface.
2. Locate the foam gasket and top angle rail
3. Attach the foam gasket to the top angle rail.

7.

Install side retainer to cabinet as shown in

FIG.8b-9.

(see FIG 8b-9)

6. Insert top and bottom legs of window filler panel frame

into channel in the top angle and bottom rail. Do both

sides

FIG. 8b

PLASTIC

FRAME

WINDOW FILLER

PANEL

SIDE RETAINER

8. Once the window panels are correctly installed, for 25K

insert the washer head locking screws on the top rail and

frame. Do not tighten all the way at this time. Allow the

bottom frame to slide freely.

Placing the Cabinet Inside the Window

1. Open the window and place the cabinet in the middle

of the window sill.

2. Make sure the bottom rail is seated over the window

sill as shown below. Bring the window down temporar-

ily behind the top angle rail to hold the cabinet in place.

3. Fasten cabinet to window sill using two 7/8” Round-

head screws (3/4” ROUND-Head screws on SG-WAC-

25ESE). Pre-drill holes if needed. Add the bottom rail

seal over the screws.

FIG. 9

TOP VIEW

SILL

BOTTOM

RAIL

ROUND-HEAD SCREW
3/4"for 25ESE
7/8"for 15/18ESE

Advertising
This manual is related to the following products: