7 specify the otd name, 8 review selections, Specify the otd name – Sun Microsystems eWay JDBC/ODBC Adapter User Manual
Page 55: Review selections

Chapter 4
Section 4.2
Using the JDBC/ODBC eWay Database Wizard
Creating a New JDBC OTD
JDBC/ODBC eWay Adapter User’s Guide
55
Sun Microsystems, Inc.
4.2.7
Specify the OTD Name
Specify the name that your OTD will display in the Enterprise Designer Project
Explorer.
Steps Required to Specify the OTD Name:
1
Enter a name for the OTD. The OTD contains the selected tables and the package
name of the generated classes. See Figure 26.
Figure 26 Naming an OTD
2
Click Next.
4.2.8
Review Selections
Review the selections made for the new OTD.
Steps Required to Review Your OTD Selections:
1
View the summary of the OTD. If you find you have made a mistake, click Back and
correct the information.
2
If you are satisfied with the OTD information, click Finish to begin generating the
OTD. See Figure 27.
The resulting OTD appears on the Enterprise Designer’s Project Explorer.