Chapter 3 installing the switch, Selecting a site, 3 installing the switch 3-1 – SMC Networks 48-Port User Manual

Page 35: Selecting a site -1, Hapter, Nstalling, Witch

Advertising
background image

3-1

C

HAPTER

3

I

NSTALLING

THE

S

WITCH

Selecting a Site

TigerSwitch 10/100 units can be mounted in a standard 19-inch
equipment rack or on a flat surface. Be sure to follow the
guidelines below when choosing a location.

◆ The site should:

•

be at the center of all the devices you want to link and near
a power outlet.

•

be able to maintain its temperature within 0° to 50° C and
its humidity within 5% to 95%, non-condensing

•

provide adequate space (approximately two inches) on all
sides for proper air flow

•

be accessible for installing, cabling and maintaining the
devices

•

allow the status LEDs to be clearly visible

◆ Make sure twisted-pair cable is always routed away from power

lines, fluorescent lighting fixtures and other sources of electrical
interference, such as radios, transmitters, etc.

◆ Make sure that a separate grounded power outlet that provides

100 to 240 VAC, 50 to 60 Hz, is within 8 feet of each device and
is powered from an independent circuit breaker. As with any
equipment, using a filter or surge suppressor is recommended.

Advertising