Dismounting and mounting mid-mount loader, Mounting loader, Assembly – Servis-Rhino 2409TL User Manual

Page 39: Assembl y

Advertising
background image

ASSEMBLY

2409TL 01/11

Assembly Section 3-5

© 2011 Alamo Group Inc.

ASSEMBL

Y

Dismounting and Mounting Mid-Mount Loader

Mounting Loader

Mounting is basically reverse of dismounting.

1. Slowly drive tractor into loader approximately 6”

from loader mounts. Shut off tractor engine and
set parking brake.

2. Connect hydraulic hoses. Make sure couplers

are clean before connecting together.

3. Start engine and release parking brake. Make

sure lift cylinders are extended 6” to 8”. Stroke
bucket cylinders to raise or lower upright pin to
clear each front mount pin saddle by
approximately 1”.

4. Drive tractor forward until loader upright pins

contact mount vertical stop surfaces just above
the mount pin saddles. Extend bucket cylinders
to FULLY seat both loader upright pins into
mount pin saddles and raise parking stands off
ground. Retract lift cylinders, allowing tractor to
move forward. Continue until loader uprights
have fully seated into back of mount tube
saddles by retracting lift cylinders to raise
tractor front end (tires can be off ground).

5. Stop engine. Allow tractor front end to lower by

relaxing ONLY lift cylinders with control lever.

Advertising