On-site assembly – SPX Cooling Technologies Marley QuadraFlow User Manual

Page 6

Advertising
background image

The QuadraFlow is factory-fabricated, and is designed to

be assembled at the jobsite. This allows the design flexibility

that results from the unique QuadraFlow configuration and

permits a wide variety of orientations.

Normally this assembly is included as part of the cooling

tower contract, and is performed by erection subcontractors

recognized and sanctioned by SPX. Their knowledge and

expertise assures proper fit-up, alignment, and sealing of

the various tower components—and contributes significantly

to the trouble-free long-term operation of the tower. It also

enables SPX to guarantee the thermal performance of the

assembled tower. Therefore, it is strongly recommended

that either SPX supervision or complete tower erection be

included as part of your order.

Nevertheless, we recognize that circumstances may

produce situations that require the tower to be assembled

by inexperienced personnel without benefit of SPX erection

labor or supervision. In support of that, a comprehensive,

illustrated, assembly instruction manual is included with every

shipment. This manual pictorially identifies the various tower

components and provides step-by-step instructions designed

to result in a properly assembled installation. Copies of this

manual are also available to customers, on request, prior to

the shipment of the tower to permit planning of the assembly

process. However, we regret that thermal performance of

a QuadraFlow cannot be certified or guaranteed without

qualified SPX supervision during the assembly process.

/ On-Site Assembly /

Advertising