Sequence of operation – State Industries GP650YTPDT User Manual

Page 41

Advertising
background image

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

Technical Literature Department

40 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

SEQUENCE OF OPERATION

Call for heat initiated

Air Pressure Switch Test Is Performed
Blower Prover Switch is

verified open

Blocked Intake and Blocked Exhaust Switches are

verified closed

Blower Prover Switch is

verified closed

Igniter is energized for warm up period

(approx 17 seconds)

YES

Gas Valve Is Energized

Gas Flows To Burner

Control System (CCB) Verifies Flame

Sensing Current at 1.0µA DC Micro Amps Minimum

Control System Declares

Fault Condition - Locks Out

One of the following

Fault Messages Displayed:

“Blower Prover Failure”

“Blocked Inlet”

“Blocked Exhaust Vent”

NO

Blower Motor is energized

Pre-purge State

YES

Control System (CCB) Verifies Igniter

Current at 2.0 AC Amps Minimum

YES

Control System Declares

Fault Condition - Locks Out

“Blower Prover Open”

Fault Message Displayed

NO

Control System Declares

Fault Condition - Locks Out

“Low Igniter Current”

Fault Message Displayed

NO

YES

NO

Water Is Heated To

Operating Set Point

Gas Valve Is

De-energized

Inter-Purge State

30 Sec Approx

Gas Valve Is

De-energized

Retries Up To

3 Times

Post-Purge State

30 Sec Approx

Control System Declares

Fault Condition - Locks Out

“Ignition Failure”

Fault Message Displayed

Control System Goes Into

Standby State/Mode

Advertising