Sterling SDF 250 User Manual

Page 58

Advertising
background image

SDF 250/400/500

Transport, Assembly and Storage 7-3

with a workshop crane

Check if the eyelets are installed on the dryer housing.

If this condition is met, fasten the transport cables to the eyelets.

If this condition is not met, mount the eyelets and then fasten the transport cables to the eyelets.

Disassemble the eyelets after set-up.

Figure 6: Transport with a workshop crane

Advertising
This manual is related to the following products: