Important, Side view – Spalding 21112201 User Manual

Page 7

Advertising
background image

11/05

ID# 21112201

7

Fill hole completely with concrete.

7.

1" (2.54 cm)

1" (2.54 cm)

FILL TO

HERE

8.

Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions
several times while concrete is curing.

1" (2.54 cm)

SIDE VIEW

DRAINAGE HILL

IMPORTANT!:

CONTINUE ON TO NEXT STEP.

DO NOT WAIT FOR CONCRETE TO CURE.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO

NEXT STEP. CONCRETE MUST CURE.

PLAYING SURFACE

Advertising