Important – Spalding M88604C1 User Manual

Page 7

Advertising
background image

7

08/06

ID# M88604C1

IMPORTANT!:

WAIT A MINIMUM OF 72 HOURS BEFORE GOING ON

TO NEXT STEP. CONCRETE MUST CURE. ALLOW ADDITIONAL TIME

FOR COLD, WET OR HUMID WEATHER.

IMPORTANT!

Check leveling of mounting plate

several times with carpenter’s level

while concrete is curing.

24

24

24

24

Insert ground tube assembly (2) into cement as shown. Move assembly around to release any air
pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to level
mounting plate on top of drainage hill. Level mounting plate and square with playing surface. Clean off
any excess cement on mounting plate at this time and place washers (24) on mounting bolts (19).

5.

PLAYING SURFACE

IMPORTANT!

NOTE ORIENTATION

Front of mounting

plate (2) must be

parallel with playing

surface.

10

10

2

PLAYING SURFACE

10

Advertising