Gas equipment start-up – Sterling TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS GG-30 User Manual

Page 43

Advertising
background image

43

Customer ____________________________________ Job Name & Number _________________________

PRE-INSPECTION INFORMATION

With power and gas off.

Type of Equip:

Unit Heater

Serial Number

_________________________ Model Number __________________________

Name Plate Voltage:

_____________

Name Plate Amperage: _____________

Type of Gas:

Natural

LP

Tank Capacity _______ lbs.

Rating: _ _____ BTU @ ____ °F

_______ kg

_ _____ kw @ ____ °C

Are all panels, doors, vent caps in place?

Has the unit suffered any external damage?

Damage ______________________________

Does the gas piping and electric wiring appear to be installed in a professional manner?

Has the gas and electric been inspected by the local authority having jurisdiction?

Is the gas supply properly sized for the equipment?

Were the installation instructions followed when the equipment was installed?

Have all fi eld installed controls been installed?

Do you understand all the controls on this equipment? If not, contact your wholesaler or rep.

(DO NOT START this equipment unless you fully understand the controls.)

GAS EQUIPMENT

START-UP

GENERAL

With power and gas off.

Make certain all packing has been removed.

Tighten all electrical terminals and connections.

Check all fans & blowers for free movement.

Check all controls for proper settings.

BLOWER

With power on and gas off.

Check voltage L1 _____ L2 _____ L3 _____

Check rotation of main blower.

Check motor amps L1 _____ L2 _____ L3 _____

Blower RPM _____________

Check air fi lters. (Record quantity & size.)

Remarks:

_____________________________________________

__________________________________________________
__________________________________________________

GAS HEATING

With power and gas on.

Inlet gas pressure.

____ in. W.C. or ____ kPa

Burner ignition.

Manifold gas pressure. ____ in. W.C. or ____ kPa

Cycle on HIGH LIMIT.

Cycle and check all other controls not listed.

Cycle by thermostat or operating control.

Advertising