Sub-Zero UC15IO User Manual

Page 14

Advertising
background image

Installation

90° DOOR STOP

Door stop pins provided with the ice machine will limit the

door swing to 90°. Follow these steps to install:

1) Open the door to approximately 80°.

2) Insert the stop pin into the bottom door hinge (pin

enters from the top). Refer to the illustration below. The

pin must be inserted until the head has made contact

with the hinge body.

3) Insert the stop pin into the top door hinge (pin enters

from the bottom).

4) Check for proper operation.

HINGE COVER INSTALLATION

Install the hinge covers after installation of the ice machine

is complete. The 90° door stop must be installed prior to

installing the hinge covers. It will be necessary to remove

the knock-out in the hinge cover when the 90° door stop

is used.

Make sure hinges are free of dirt or grease before applying

covers. To install, remove backing paper from the adhesive

pads and bond to the hinge. Attach the magnetic center

covers. Refer to the illustration below.

Ice Machine Installation

14

DOOR STOP PIN

90° door stop.

Hinge cover installation.

KNOCK-OUT

Installation Checklist

To ensure a safe and proper installation, the following

checklist should be completed by the installer to ensure

that no part of the installation has been overlooked.

INSTALLATION CHECKLIST

Have all electrical and water connections been made?

Is the power cord plugged into a properly grounded

3-prong outlet, which has been installed in accordance

with all applicable electrical codes?

Is the water supply turned on? Have water supply and

drain connections been examined for leaks?

Is the ice machine drain line routed to an open site

drain for gravity drains and according to instructions

for drain pump models?

Has all packing materials and tape been removed?

Is the ice machine level? Are all leveling legs making

contact with the floor?

Has the kickplate been installed properly? Is there

proper clearance in front of the kickplate for airflow?

If applicable, is the door panel installed properly?

If applicable, has the 90° door stop been installed?

Have hinge covers been installed?

Has the ice machine and bin been sanitized?

Does the customer understand the unit's operation and

maintenance? Have you given the customer the

warranty package?

Have any installation or service problems been noted

on the product registration card? Has the registration

card been mailed in?

If applicable, has the stainless steel door panel been

inspected for any imperfections? This is to be done by

the dealer or installer with the customer upon comple-

tion of the installation. Stainless steel panels are

covered by a limited 60-day parts and labor warranty

for cosmetic defects.

Advertising