Step 18b, Main gas valve coil check – State Industries SBD85 500 User Manual

Page 41

Advertising
background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

40


STEP 18B

MAIN GAS VALVE COIL CHECK






STEP 18B. MAIN GAS VALVE COIL CHECK – SBD 500 ONLY
Condition:

•

Pilot lights

•

Sparking stops

•

No main burner ignition

Test Procedure:

•

Power off

•

Disconnect red, main valve wire from module MV terminal

•

Meter set to test for DC amperage

•

10A wire to red gas valve wire, COM wire to MV terminal of ignition module

•

Turn power on to heater

•

After pilot lights and sparking stops


IF: THEN:
.25 to .35 DC Amps is not present

•

Replace the gas valve

.25 to .35DCA is present

•

Main burner gas should ignite.


Be certain to correct you meter wire connections and setting before performing further
tests.

RED

WHITE

BLUE

MANIFOLD

PRESSURE

TAP

MANIFOLD

PRESSURE

TAP

PILOT GAS

MANIFOLD

GAS

The PV wire is connected to the blue wire

The MV/PV wire on the IID is connected to the white wire.

The MV wire is disconnected from the gas valve.

Advertising
This manual is related to the following products: