Connection configuration #3, Solid copper wire – Sundance Spas Spas 880 Series User Manual

Page 27

Advertising
background image

25

Connection Configuration #3
240 vAC Connections for denali, dover, Tacoma Models
(North America 60 Hz)

Red (L2)

Pigtail

Neutral Bus

Ground

TB2

TB1

Black (L1)

White (N)

Green

Main

Service

Panel

with

GFCI

White (N)

Black (L1)

Red (L2)

240 VAC/120 VAC

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

Load Neutral Lug on Breaker

2-Pole Circuit Breaker with 3-Wire Grounded Load Connection

(4 Wires to Hot Tub, 2-Hot (L1-L2), 1-Neutral (N), 1-Ground)

Note: service disconnect not

shown in this diagram.

The control box TB1 terminal

position varies between models.

W B R

Hot Tub

Contr

ol Box

Red (L2)

Pigtail

Neutral Bus

Ground

TB2

Black (L1)

GFCI Sub Panel*

Main Panel*

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

Load Neutral Lug on Breaker

Main Panel with Secondary GFCI Shut-Off Box Using a

2-Pole GFCI Breaker with 3-Wire Grounded Connection

(4 Wires to Hot Tub, 2-Hot (L1-L2), 1-Neutral (N), 1-Ground)

White (N)
Green (Ground)

*GFCI Sub Panel commonly

used when recommended GFCI

does not install in Main Panel.

Note: service disconnect not

shown in this diagram.

The control box TB1 terminal

position varies between models.

Red (L2)

TB1

Black (L1)

White (N)

Green

W B R

Hot Tub

Contr

ol Box

A pressure sensitive
terminal block (bonding
lug) is attached to the
outside surface of the
load box. This permits
the connection of a
bonding wire between
this point and any metal
equipment chassis,
metal water pipe, or
metal conduit within 5 ft
(1.5m) of the spa. The
bonding wire must be at
least #8 AWG (8.4 mm

²

)

solid copper wire.

Advertising
This manual is related to the following products: