Preparations before operation – Sanyo SANUPS E11A102A User Manual

Page 21

Advertising
background image

− 18 −

8. Preparations Before Operation

Check the following items before starting operation:

①

Visually inspect the UPS to verify that there is no visible damage.

②

Check that the UPS is connected to a utility power source that meets the input

specifications.

③

Check that the input switch MAIN SW is set to “OFF”.

④

Check that load devices are connected correctly.

⑤

Check that none of the connections is loose.
















BATT

EXT.

MAIN SW

②

, ⑤Check input

power source

④

, ⑤Check load

connections.

③

Switch is “OFF”.

Advertising