Important: only hand tighten screws at this time – Swim'n Play end deck User Manual

Page 6

Advertising
background image

3

IMPORTANT: ONLY HAND TIGHTEN SCREWS AT THIS TIME

6

Position the Bottom Support Channels (long “L” shaped pieces) at the bottoms of the
Posts according to the illustration below for your size deck.

Note the different sizes. (The illustrations are as viewing the deck from above with the
Ladder to be installed on the left side.)

15’ END DECK

&

18’ END DECK

12’ END DECK

73-3/4”

58-7/8”

POOL

73-3/4”

58-7/8”

58-7/8”

58-7/8”

73-3/4”

73-3/4”

POOL

75”

73-3/4”

58-7/8”

58-7/8”

58-7/8”

58-7/8”

75”

73-3/4”

Having positioned the Bottom Support
Channels in their proper locations as
illustrated above, attach them to the
bottom of the Posts (including the Post
for the Ladder) using 1/2” Sheet Metal
Screws as shown at right.

1/2” SHEET

METAL SCREW

BOTTOM SUPPORT

CHANNEL

1/2” SHEET

METAL SCREW

BOTTOM

OF POST

NOTE: On the 12’ End Deck, you must now attach
1 side of remaining 72½” Bottom Support Channel
to the outside Posts nearest the pool. See right.

12’ END DECK

52-5/16

15’ END DECK

66-3/4

18’ END DECK

79-7/16

Advertising