Important, Side view – Spalding M867SF12 User Manual

Page 6

Advertising
background image

6

ID# M867SF12

08/06

;;

;;

;;

;;

;;

;;

;;

;;

;;

;;

;;

;;

Insert J-bolts (19) from mounting plate (2) into cement as shown. Move assembly around to release
any air pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to
level mounting plate on top of drainage hill. Level mounting plate and square with playing surface.
Clean off any excess cement on mounting plate at this time and place washers (24) onto J-bolts.

PLAYING SURFACE

1" (2.54 cm)

SIDE VIEW

DRAINAGE HILL

PLAYING SURFACE

Fill hole with concrete. Tamp down concrete to release air pockets
and build drainage hill.

IMPORTANT!:

WAIT A MINIMUM OF 72 HOURS BEFORE GOING ON

TO NEXT STEP. CONCRETE MUST CURE. ALLOW ADDITIONAL TIME

FOR COLD, WET OR HUMID WEATHER.

IMPORTANT!

Front of mounting plate

(2) must be parallel with

playing surface.

2

IMPORTANT!

Check leveling of mounting plate

several times with carpenter’s level

while concrete is curing.

4.

5.

24

24

24

24

Advertising