D. plumbing preparation, B. install wood floor rail – Kohler VINTAGE K-1172 User Manual

Page 5

Advertising
background image

5

110050-2-

AB

Kohler Co., Kohler WI U.S.A.

2.

Recess Installation: The suggested stud

construction is illustrated.

3.

Sunken Installation: Refer to Roughing-In notes
beginning on Page

1

for cut-out details. Make sure

the whirlpool is supported by the supporting feet on
the bottom of the whirlpool. Do not hang the
whirlpool by the rim.

D. PLUMBING PREPARATION

Position the plumbing according to the roughingĆin

dimensions. Cap the supplies, and check for leaks.

6.

BEFORE INSTALLING UNIT

A. PARTIALLY INSTALL BATH DRAIN

Install the drain on the bath according to the drain

manufacturer's instructions. When installing the drain

overflow tube and hood, be sure to adequately seal along

the edges of the hood to prevent leakage.

B. INSTALL WOOD FLOOR RAIL

Make sure all rough plumbing and finish flooring are

complete. Attach the floor brackets to the floor rail with

the screws provided.
Apply two beads of silicone sealant to the bottom surface

of the floor rail. Position the floor rail in the desired

location, and secure to the floor with the screws

provided.
Use at least four people to carefully lift the bath inside

the floor rail. Position the bath so there is equal space

between the bath skirt and the floor rail.
Insert the dowels in the ends of the floor rail. Apply

silicone sealant to the end rails, and press them

completely onto the dowels. Remove any excess sealant.

Floor Rail

Apply Silicone
Sealant

Screws

Floor
Bracket

Dowel

Advertising
This manual is related to the following products: