Prepare the antenna site, Prepare the antenna site, 6, Prepare the antenna site 4 – KVH Industries TracVisionM5 User Manual

Page 6

Advertising
background image

6

Once you have identified a suitable antenna
mounting site, according to the guidelines
provided in Step 2, follow these steps to drill the
mounting holes and cable access hole to prepare
the site for installation.

a. Unfold the antenna mounting template

(supplied in the Customer Welcome Kit) and

place it onto the mounting surface. Make sure

the “FWD” (forward) arrow points toward

the bow and is parallel to the vessel’s

centerline (see Figure 8).

NOTE: You don’t need to mount the antenna
exactly on the vessel’s centerline, but the
antenna’s forward arrow must be parallel to it.

b. Use the template to mark the locations for the

four mounting holes and cable access hole on

the mounting surface.

c. Drill a 3/8" (10 mm) hole at the four

mounting hole locations you marked in

Step 4b. Later, you will insert four 1/4"-20

bolts through these holes to secure the

antenna to the mounting surface.

d. Cut out the 3" (80 mm) cable access hole in

the location you marked in Step 4b. Smooth

the edges of the hole to protect the cables.

Later, you will route the data, power, and RF

cables through this hole and into the vessel.

e. Clean and dry the antenna mounting surface.

f. Peel off the paper backing from the supplied

foam seal to expose the adhesive. Then press

the foam seal down firmly onto the mounting

surface, ensuring the narrow end points

toward the bow and the hole in the foam seal

aligns with the cable access hole in the

mounting surface (see Figure 9).

9"

(229 mm)

FWD

3/8" ( 10 mm)

Mounting Hole (x4)

9"

(229 mm)

3" ( 80 mm)

Cable Access Hole

Figure 8: Antenna Mounting Holes Layout

Figure 9: Foam Seal

Bow

Align with

Cable Access Hole

Prepare the Antenna Site

4

Advertising