Before you begin, follow these steps to make sure
you have everything you need to complete the
installation.

a. Unpack the box and ensure it contains

everything shown on the Kitpack Contents
List
. Save the packaging for future use.

b. Carefully examine all of the supplied parts to

ensure nothing was damaged in shipment.

c. Gather all of the tools and materials listed

below. You will need these items to complete

the installation.

• Flat-head and Phillips-head screwdrivers

• Electric drill and 3/8" (10 mm), 5/32"

(4 mm), 3/32" (2.25 mm), and #29 bits

• 3" (80 mm) hole saw

• Socket wrenches

• 7/16" open-end wrench

• Light hammer and center punch

• Adhesive tape

• Scriber or pencil

• Wire strippers and terminal lug crimper

• RG-6 or RG-11 RF coax cable(s) with

Snap-N-Seal® F-connectors for

connecting the antenna to the receiver(s)

(see Step 7a on page 9 to determine the

number and type of cables required)

• Connector installation tool (Augat IT1000

- KVH part #19-0242)

• Power cables for connecting power to the

switchplate and MCP (see Figure 2)

• Satellite TV receiver and TV

Radome

Baseplate

Figure 1: TracVision M5 System Components

Antenna

Switchplate

MCP (MultiSat Control Panel)

Always lift the antenna by the baseplate and

never by the radome or any portion of the

internal antenna assembly (see Figure 1).

IMPORTANT!

Figure 2: Guidelines for Power Cables

Cable Length

Use Cable Gauge

< 40 ft (12 m)

14AWG (2.5mm

2

)

40-70 ft (12-21 m)

12AWG (4mm

2

)