Keys Fitness 1-2 Person Sauna BS-9101 User Manual

Page 9

Advertising
background image

Figure 19

8) Place the TOP PANEL

L BOX is the up side.

nt of TOP PANEL. (see figure 20)

Feed these

3>

e properly

4>

ANEL into place. (see figure 22)

) CONTROL BOX

control center of the sauna room and is installed on the TOP PANEL, input/output

con

1>. The side with the CONTRO
2> The edge nearest to the CONTROL BOX is the fro

Be careful of the wires in the SIDE PANELS before you set the TOP PANEL down.
wires through the holes in the TOP PANEL. Feed the control cable and CD connectors down
from the TOP PANEL through the long-shaped hole to the inside of the sauna.
Be careful not to force the TOP PANEL in to place without making sure that the wires ar
fed through the holes. (see figure 21)
When all wires are set, lower the TOP P

Figure 22




9

The control box is the

nection as below. (See Figure 3)

Advertising