1 - pcb removal and replacement, Unit will not operate. refer to, Section 5.4.1, “pcb – KVH Industries TracVision S3 User Manual

Page 55: Removal and replacement, For details on the fuse, 1 pcb removal and replacement

Advertising
background image

5-5

Maintenance

54-0157 Rev. G

5.4.1 PCB Removal and Replacement

Estimated Time to Repair:

1

2

hour

The microprocessor PCB assembly is protected by a cover
fastened to the rotating plate

Fig. 5-1

. The cover must be

removed to gain access to the main power fuses and the PCB
assembly.

1. Using needle-nose pliers, remove the E-ring from

one end of the connecting rod

Fig. 5-2

.

2. Remove the connecting rod by sliding it off the

bracket.

3. Fully retract the elevation axis motor shaft

– Fig. 5-5.

4. Remove 6 pan head screws from the PCB cover

flanges.

5. Remove the PCB cover. To get the necessary

clearance, rotate the linear actuator up 90º while
lifting the PCB cover – Fig. 5-5.

6. Remove all cable connectors from the PCB.

Figure 5-6

on the following page illustrates the

PCB arrangement and connector locations.

TracVision L3/S3 is equipped with
two 5x20 mm, 3.15-amp, 250-volt
fast-blow fuses, which are mounted
on the PCB. To access and replace
one of the fuses, remove the PCB
cover.

When carrying out maintenance
on the PCB, be sure to not drop
any of the small screws inside the
mechanism. If a screw is lost within
the baseplate, it must be retrieved
to avoid causing any damage when
the unit rotates.

PCB Cover

Linear Actuator

Elevation Axis

Motor Shaft

Figure 5-5
Removing the PCB Cover

Advertising
This manual is related to the following products: