For right rear piping – LG 3828A30087S User Manual

Page 18

Advertising
background image

18 Room Air Conditioner

Installation

Wrap the insulation material around the
connecting portion.

• Overlap the connection pipe insulation material

and the indoor unit pipe insulation material. Bind
them together with vinyl tape so that there is no
gap.

Route the indoor tubing and the drain hose to
the required piping hole position.

Plastic bands

Insulation material

Connection pipe

Flare nut

Indoor unit tubing

Torque wrench

Spanner (fixed)

Vinyl tape(narrow)

Adhesive

Drain pipe

Indoor unit drain hose

• When extending the drain hose at the indoor unit,

install the drain pipe.

• Mount the clamp on the boss with a type "B"

screw.(SE-H/P: 9k, 12k C/O: 12k)

• Tighten the flare nut with a wrench.

• Wrap the area which accommodates the rear

piping housing section with vinyl tape.

For right rear piping

Connecting the pipings to the indoor unit
and drain hose to drain pipe.

• Put a couple drops of refrigerant oil on the face of

the flare before assembling taking care not to add
any contaminants.

• Align the center of the pipings and sufficiently

tighten the flare nut by hand.

Indoor unit tubing

Flare nut

Pipings

Drain hose

Vinyl tape(narrow)

Connection
pipe

Connecting cable

Vinyl tape
(wide)

Wrap with vinyl tape

Indoor
unit pipe

Pipe

• Bundle the piping and drain hose together by

wrapping them with vinyl tape over the range
within which they fit into the rear piping housing
section.

Wrap with vinyl tape

Drain hose

Pipe

Vinyl tape(wide)

Drain hose

Clamp

Boss

Type "B" screw

mm

inch

mm

inch

Ш6.35

1/4

1.1~1.3

0.043~0.051

Ш9.52

3/8

1.5~1.7

0.059~0.066

Ш12.7

1/2

1.6~1.8

0.063~0.070

Ш15.88

5/8

1.6~1.8

0.063~0.070

Ш19.05

3/4

1.9~2.1

0.074~0.082

Outside diameter

A

Advertising