Installation map – LG LAN091CNP User Manual
Page 13
 
Service Manual 13
Installation Map
Installation parts you should purchase.
NOTICE
(Left and right
are identical)
More than 
28"(70cm)
More than
23.6"(60cm)
Sleeve
Bushing-Sleeve
Putty(Gum Type Sealer)
Vinyl tape (Wide)
• To carry out the drainage 
 test, remove the air filter
 and pour water into the heat 
 exchanger.
• Apply after carrying out a
 drainage test.
Saddle
More than
19.6"(50cm)
Gas side piping (Optional part)
Liquid side piping (Optional part)
Additional drain pipe
Vinyl tape (Narrow)
Connecting cable
(Optional part)
Bend the pipe as close as possible 
on the wall but be careful so that it 
may not break.
More than
11.8"(30cm )
More than
11.8"(30cm )
More than
11.8"(30cm)
More than
11.8"(30cm)
More than
More than
3.9"(10cm)
3.9"(10cm)
More than
7.9"(20cm)
Installation